top of page
4051730880033_.pic_hd.jpg

Smart Urban Mobility Hub

Unleashing the Potential of Space and Efficiency
"Current Service, starting in 2025"

网页图片_画板 1 副本.png

Urban Air Mobility (UAM) Hub

An integrated air–ground node on our deep-shaft platform: land, fast-charge, schedule, and dispatch eVTOL fleets with seamless transfer to robo-taxis, public transit, and EV supercharging.

Big Data & User Interconnection

Unified ID, payment, and loyalty with privacy-by-design APIs for partners.

ICV (Intelligent and connected vehicles)

Plug-and-play V2X; license-plate/ID access and OTA links for frictionless entry and services.

Robo-Taxi Fleet Hub

On-site dispatch and fast turnaround; charge, stage, and route autonomous fleets with AI for seamless transfers across the hub.

AI-Powered Intelligent Operation Efficiency Mgt. Terminal

Single control room for predictive scheduling, energy optimization, and SLA dashboards.

Smart City

Ties into traffic, transit, energy, and emergency systems; grid-friendly charging and higher land-use efficiency.

On top of underground deep shaft parking, we integrate automated DC charging technologies and autonomous driving ecosystems from leading OEMs worldwide. By making highest and best use of urban underground space resources, we provide users with one-step smart mobility solutions for parking and charging, offering an excellent experience. In the future, we will also integrate UAM take-off and landing ports and charging stations to create an integrated E-mobility hub.

Our Project

The Hyperpark Guangzhou project is dedicated to maximizing the utilization efficiency of land resources in central urban areas through technological innovation, addressing the decades-long issue of insufficient parking space supply in communities, while also expanding urban park green spaces to enhance livability. Equipped with photovoltaic and distributed energy systems, the project provides high-power charging services for electric vehicles without increasing grid load, and is committed to achieving its long-term goal of carbon-neutral operations.

pipeline project-02.png

01.

Land Overview

Land size: 1,516 m².

Land use: Public green space with auxiliary facilities.

Land tenure: 50 years.

02.

Parking and Charging Key Facts

3 shafts, 305 total parking slots (300 underground), and 5 charging poles.

Future Development

After the completion of network, HyperPark will integrate Robo-taxi fleets and UAM economy application scenarios to iterate the urban new energy transportation ecosystem

Network Effect

Robo-Taxi Terminal Network

  • Avoid the high transformation cost of traditional garages.

  • When there is empty space, Robo-taxis can park nearby at any time and charge in a timely manner to reduce traffic load.

  • When receiving an order, dispatch nearby vehicles in the base station immediately to realize the tidal management of the fleet service

UAM Economy Terminal Network

  • Comprehensive Terminal Station: Concentrated parking, charging, and maintenance, serving as the starting   terminal station.

  • Stopping Station: Temporary parking and fast charging, enabling fast boarding and alighting at stations.

4051730880033_.pic_hd.jpg
guangzhou vision.jpg
bottom of page